Recent work by Concepts Construction, written up the way we keep every project record: what was needed, what was done, and how it finished.
The bathroom was worn out and due for a full rebuild, not a patch. The old bathroom came out entirely, and the subfloor underneath needed replacing before anything new could go in.
We stripped the room back and rebuilt it. New subfloor went down first, then new drywall on the shower walls. The new tub is black, set into white subway tile with black grout and a black niche. Vinyl plank flooring went down through the room, and we finished it with a new vanity, toilet and fixtures, a fan, and fresh paint throughout. Getting the fan in meant running its wiring through a double-layer top plate, and we patched and finished that properly rather than leaving it.
New subfloor, drywall, a black tub, white subway tile with black grout, vinyl plank flooring, a new vanity, toilet and fixtures, a bathroom fan, and paint.
Orillia
A finished bathroom with every surface new, from the subfloor up, done properly behind the walls as well as in front of them.
Planning something like this? See our Bathroom renovation in Orillia page for what the work involves.
All case studies