Real projects by Concepts Construction across Simcoe County, written up in five parts: what the customer needed, what work was completed, the materials used, the town, and the finished result. Studies are anonymous by design: towns only, never names or addresses.
The caulk in the shower had failed and yellowed, the grout was stained, and mould was coming out of the grout lines. The homeowner wanted the shower cleaned up and sealed again.
Read the case studyThe bathroom was worn out and due for a full rebuild, not a patch. The old bathroom came out entirely, and the subfloor underneath needed replacing before anything new could go in.
Read the case studyAn apartment unit in Orillia needed a full renovation before it could be lived in again: a worn kitchen, tired paint throughout, and a weak spot in the subfloor.
Read the case studyThe inside of a home in Orillia needed a full refresh: worn flooring through the main rooms, drywall and paint to redo, doors and trim to sort out, and a drain that was backing up.
Read the case studyAn insurance claim left rooms in this Orillia home damaged and in need of restoration, with the stress of the claim itself on top of the damage.
Read the case studyThe old deck had to come out, and the homeowners wanted a proper replacement built to last, with the design and permit handled instead of left to them.
Read the case studyThe old siding was at the end of its life and the house needed a full re-side, not another patch.
Read the case studyThe basement was unfinished space the homeowners wanted turned into living space, with a bar area built in.
Read the case studyAn insurance claim left the home with mouldy drywall, damaged trim and a bad window, and insulation that had to come out.
Read the case studyA wall had to come out completely and be rebuilt, and the room around it needed insulation, a window and a shower faucet to finish the job.
Read the case studyThe floor structure was failing: the subfloor, joists and main beam in a 145 square foot section had to come out, and there was mould to treat.
Read the case studyMould had taken hold in a section of drywall roughly 10 feet by 4 feet, and the affected material had to come out, not get painted over.
Read the case studyThe home needed a new water heater, and the replacement had to be a high efficiency unit that vented properly.
Read the case studyA housing unit needed a run of repairs handled by one crew: insulation work, a foundation crack to seal, and a set of back concrete stairs that had to come out and be replaced.
Read the case studyIce had dammed up on a north facing roof where the roofing structure was exposed, and water had a way in at the soffit and roof penetrations.
Read the case studyThe contracted work covered a commercial renovation in Orillia, and as the project progressed a package of extra work was added to it.
Read the case study