Recent work by Concepts Construction, written up the way we keep every project record: what was needed, what was done, and how it finished.
Mould had taken hold in a section of drywall roughly 10 feet by 4 feet, and the affected material had to come out, not get painted over.
We sealed the work area off with plastic to isolate it, removed the mouldy drywall in the affected area, and ran a lead test as part of the job. We supplied and installed new drywall, finished it, and primed and painted the ceiling with two coats.
Plastic sheeting to seal off the work area, new drywall, primer and paint.
Orillia
The mouldy material gone, the wall rebuilt and finished, and the ceiling painted out clean.
Planning something like this? See our Restoration and preservation page for what the work involves.
All case studies