Recent work by Concepts Construction, written up the way we keep every project record: what was needed, what was done, and how it finished.
The caulk in the shower had failed and yellowed, the grout was stained, and mould was coming out of the grout lines. The homeowner wanted the shower cleaned up and sealed again.
We said it plainly before any work started: new caulk treats the surface only. The moisture and mould behind the tile are the real problem, and a full shower renovation is the fix that lasts. She chose to go ahead with the recaulk as a short-term step, and we recaulked the shower on Nov 6, 2026. The caulking work itself carries a one-year warranty.
New caulking.
Barrie
The shower is sealed and clean at the surface, and the homeowner knows exactly what she bought and what it does not fix. When she is ready for the full renovation, she has our written estimates for that work in hand.
Planning something like this? See our Bathroom remodeling page for what the work involves.
All case studies