Recent work by Concepts Construction, written up the way we keep every project record: what was needed, what was done, and how it finished.
The floor structure was failing: the subfloor, joists and main beam in a 145 square foot section had to come out, and there was mould to treat.
We removed the subfloor, joists and main beam, then supplied and installed new floor sheathing, joists, a main beam and hangers across the 145 square feet. We repaired the rim board framing along three exterior walls, treated the mould, and sealed with professional foam sealant insulation.
New floor sheathing, joists, a main beam and hangers, rim board framing, and professional foam sealant insulation.
Port McNicoll
A floor that is solid underfoot again, carried on new structure instead of the failed original.